What should you budget for an office fit-out?

The most useful starting point is not one price per square foot. It is knowing what the rate includes, what the building already provides and which technical and workplace requirements still need to be funded.

Send Project DetailsBuild My Office Readiness Plan

A benchmark is a reference, not a quotation.

Published guides compare defined types of office fit-out. They are useful for understanding broad market specifications, but they cannot account for the condition of your floor, the existing services or what has been left outside the proposed scope.

Not a WurkSpaces price

India Office Fit Out Cost Guide 2026, Cushman & Wakefield. Collaborative Hybrid, INR per sq ft. Checked 5 November 2026.
CityCollaborative Hybrid
Mumbai6,567
Delhi6,207
Bengaluru6,027
Hyderabad5,847
Pune5,847
Ahmedabad5,847
Chennai5,847
Kolkata5,847
A published market reference for one specification. The public page does not state what the figures include or exclude, or whether tax is included. Check the guide before using a figure in an approval. Read the guide on the publisher's site

What changes the cost of your project?

Two offices of the same size can require very different budgets. These are the factors that account for much of the difference.

Cost driverWhat to consider
Starting conditionBare shell, warm shell, a partially fitted floor or renovation of an occupied office.
Space mixOpen seating, meeting rooms, private offices, collaboration areas, storage and support facilities.
Existing servicesPower capacity, air conditioning, ventilation, fire-related work and building interfaces.
Materials and specificationFurniture, partitions, finishes, lighting and performance standards.
Technology and securityAV, data cabling, Wi-Fi infrastructure, access control and other systems.
Access and executionPermitted working hours, goods lifts, material movement, phasing and site restrictions.

Compare quotations on the same scope.

A lower rate is not necessarily a lower final project cost. Before comparing proposals, check whether they use the same floor area basis, design assumptions, technical requirements, inclusions, exclusions and allowance for changes.

Comparison checklist

  • Area basis
  • Drawing revision
  • Materials and specifications
  • MEP scope
  • AV/IT/security interfaces
  • Approvals
  • Testing
  • Handover
  • Exclusions
  • Payment stages
  • Variation process

When do you get a project-specific number?

Once the floor condition, requirement and scope boundaries are understood, a contractor can prepare an appropriate proposal. If significant unknowns remain, a site assessment may be needed before the scope or budget can be meaningfully narrowed.

Send Project DetailsRequest a Readiness Review

Can you estimate our office from the area alone?

Area provides a starting reference, but not a dependable project quotation. The scope, services and building conditions have to be established.

Do market benchmark figures include every system?

Not necessarily. Each published category has its own assumptions. Review the specification and exclusions behind any figure before using it for internal approvals.